Showing posts with label OMG. Show all posts
Showing posts with label OMG. Show all posts

Tuesday, April 3, 2018

OMG - April Goal

I set up a One Month Goal for February (actually, I had several goals!), but I missed posting an update. And I totally skipped March because there has been too much going on at home for me to get any sewing done other than getting to the quilt shop for my classes.

Here were my February Goals with results.

1. Work on t shirt quilt for Aunt Donna - I have cut the shirts apart and fused the interfacing to all of the shirts. This month, I will finish this!
2. Quilt 4 personal items - I haven't quilted any personal items in the last 2 months.
3. Declutter 3 areas - Done out of necessity with my brother moving in.
4. Sock Monkey HSTs (because they will need to be packed up if not assembled into a top!) - The blocks were laid out!

Not too bad. Not too great either.

A lot of big items have been ordered for the kitchen repairs. The first big item goes in next week - upstairs carpet. This is also wreaking havoc on my quilting and piecing because all of my projects and fabric and totes have to be moved out of my studio to give the carpet layers as much room as possible to lay the carpet cleanly and evenly.

BUT I am excited that I have a quilt retreat this month and am already batting around ideas of what I will take to work on.

So my April OMG is to make the monkey blocks! If I have to put them away, at least the blocks will be made for storage.

This is what the block will look like. Some are in strips and pressed and just need to be sewn into rows. Some are still HSTs laid into the block pattern.


There are enough blocks for a couple of baby quilts. Or maybe 3 or 4. I can't remember.


Thursday, February 1, 2018

A finished top!

I meant to post this yesterday, but I ended up working from home and tried to get so much done in the time that I was online and then I went to a new local meeting of long armers and by the time I got home, I was too pooped to even sew!

So I am posting my January OMG update, my WIP Wednesday, my January UFO finish... So many blogs to link to!

Let's start with the January One Month Goals. Here are the goals.

1. Work on steps 1-3 of Road to Llano (#1)
2. Cut out and piece blocks for Come Sit a Spell (#10)
3. Work on the Sock Monkey HSTs
4. Quilt 2 personal things on To Be Quilted list

I really tried to limit myself to steps 1-3 on Road to Llano, but I haven't been able to stop myself from working on it!

104_0286

I am just about done with step 9 - I just have to do the final pressing of the darker complimentary blocks. But I couldn't resist laying out the blocks to see how it was going to end up looking. This is going to be a king sized quilt for my parents to use on their bed.

And once I got the blocks made for the Come Sit a Spell, I just have to keep going on that one, too. It helped that it was the UFO number pulled on Judy's blog.

104_0287

104_0288

I need to get backing for this one and put it in the to be quilted line.

Unfortunately, I didn't work on the sock monkey HSTs other than to separate them into stacks of the same fabric so that I can lay out the blocks. And now, the design wall is occupied....

And I didn't get anything quilted. But I have a kind of big event happening in a couple of weeks and I need to get the house in order and one of the things on my list is to get my upstairs railing cleared and that is what I have part of my To Be Quilted pile.

Now, I will make up my February OMG...

1. Work on t shirt quilt for Aunt Donna
2. Quilt 4 personal items
3. Declutter 3 areas
4. Sock Monkey HSTs (because they will need to be packed up if not assembled into a top!)

Also, I am adding the Halloween top to my 18 flimsies in 2018.

1. Come Sit a Spell

All in all, I think I did very well for my first month at my sewing machine in way too long! 

I am linking up with....
Lynette for February 18 in 2018
Judy for the January UFO finish
Elm Street Quilts for One Month Goal
Sarah for Whoop Whoop Friday