Showing posts with label mystery. Show all posts
Showing posts with label mystery. Show all posts

Saturday, October 5, 2013

Quilt #33 - Easy Street

Easy Street is quilted! I finished it earlier this week. I used a charcoal So Fine in the top, black Bottom Line in the bobbin and the Bubbles panto graph.

101_2235

101_2236

This panto is quickly becoming my favorite!

101_2237

I used an extra wide backing from Fabric.com that I got for a great price!

101_2238

The quilt will be trimmed and the binding attached to the front by the end of the weekend! :)

Monday, September 23, 2013

Design Wall Monday - 9/23

Yesterday, I worked on the bindings of three different quilts. But showing binding work is a little boring!

Last week, I finished the borders on Easy Street. That is much more exciting!

101_2176

I decided to repeat the charcoal from the 4 patches as the inner border. And one of the purples used in the quilts is the outer border and the binding.

101_2177

It was a sunny day, but not too bright and I think that is why the greens have a yellow tint to them in these pictures.

Right now, the backing is pressed and the quilting design has been chosen and the quilt is in line for quilting!!

See what others have on there walls here!

Wednesday, September 4, 2013

WIP Wednesday - 9/4

Sunday, I got the blocks for Easy Street laid out. Monday, I sewed the majority of the quilt together - I just had one seam left to stitch. I did that on Tuesday. Woot!!

101_2112

Now, I can pick the border, get the backing, make the binding and put it in line for quilting!

101_2114

This was Bonnie Hunter's holiday mystery for 2012 and I used the colors that she suggested so I can't take any credit for the color selection or the placement. I followed the pattern to the letter.

101_2113

I did spend some time yesterday looking at border options and I have narrowed down to 3 or 4. One is purple with teal and lime green squiggles, but I'm wondering if it might be too much. I also need to measure the center to see what size it came to so I can make a decision about the border size and how much fabric I will need. Maybe I will get to that tonight.

I also worked on quilting a quilt for my dog sitter. The pattern is Picture This from the Happy Hour book and it calls for small and medium scale prints. I decided to add the charcoal gray to every block so tone down the prints a little and I am happy with how the quilt top turned out.

101_1995

I'm just quilting a stipple because the quilt will be almost reversible - the backing is a pretty floral print that can be showed off when she feels the need. :)

101_2115

101_2116

I'm linking up a Freshly Pieced!

WIP Wednesday at Freshly Pieced

Wednesday, August 28, 2013

WIP Wednesday - 8/28

Monday evening, I finished the A blocks for the Easy Street mystery that Bonnie Hunter did for the holidays in 2012. This is the first mystery that I have ever done and I even started on it while the steps were still being published. :)

101_2084

Tuesday morning, I couldn't wait to web my first B block.

101_2087

And once I had that done, I just had to throw some of the setting triangles and finished blocks up on the wall to see how it was going to look.

101_2088

I just love it!! See what others are working on at Lee's blog.

WIP Wednesday at Freshly Pieced

Monday, August 26, 2013

Design Wall Monday - 8/26

So this week, a lot of progress was made on Easy Street.

This...

101_2060

became this...

101_2083

And finally this...

101_2084

All 16 of the A blocks are finished!

And now, I am starting the B blocks. One is done and only 8 more to do!

101_2085

I probably won't have them completely done before the end of the month, but by the end of next weekend is a pretty good estimate!

Tomorrow night, I need to finish quilting this for Gillian.

101_2069

See what others are working on at Judy's blog and Lynette's blog.

Sunday, July 28, 2013

Stash Report Week 30, 2013

Be sure to check out the 2,000th post giveaway! Free quilting!! There's still time to enter! And the Blogiversary giveaway will be posted later today so check back.

Not much busted this week, but enough for me to move forward on 2 projects.

I cut out the purple squares for the center of this block. It is the A block for the Easy Street mystery from Quiltville.

101_2015

It goes along with the B block that I got assembled yesterday.

101_2016

And I cut out the squares for part 3 of Road to Llano.

101_2017

I'm hoping that I can start getting the blocks assembled today.

Fabric added this week: 0.00
Fabric added YTD: 116.33

Fabric used this week: 0.87
Fabric used YTD: 60.59

Net Fabric Used: -55.74

Right now, Lula and I are enjoying the fresh air in the house!

101_2018

Monday, February 4, 2013

Design Wall Monday - 2/4

I am going to try to get back to my Design Wall Monday posts with something new or noticeable updates each week.

This week, I quilted a table runner and quilt for Jen. Both are made from the same fabric line so I used the same thread combination on both.

Here is the runner. I did a ribbon stipple free hand design on this one.

101_1315

101_1318

And here is the quilt. I used a deep honey Connecting Threads Essentials in the top and a golden Bottom Line in the bobbin. The panto is Pageboy by Urban Elementz. I'm pleased with how the panto turned out and I am going to be using it again very soon!

101_1325

101_1326

101_1327

I can happily report that the modifications that I did to the frame last week have fixed one of the biggest problems that I have had with this frame set up. What a relief!!

I have to cut the various green squares for the easy Street mystery and then I can start assembly. Everything is organized in an ArtBin.

101_1322

And Moon Pie is still on the design wall, but parts have fallen down recently and it is not as straight on the wall as it once was.

101_1323

I still have a part of a row in the 301a since it was being used as a leader/ender!

101_1324

Sunday, January 13, 2013

Weekend Quiltathon and cooking

It's been a busy weekend! I think that I am really thinking about my word of the year - do - and I am doing a lot and getting so much done!

I started the weekend by cleaning the studio and getting laundry started and trying to organize myself for Saturday. Saturday, I ran errands and hit the grocery store. I picked up a few things for dinners and when I got home, I took a nap and then got busy. I made a potato and smoked sausage casserole and a pot of chili. While that was cooking, I started something for the dogs.

They were very excited!

101_1248

Dog treats! I had to roll the dough out and use cookie cutters. I cut dogs, Ds, musical notes and diamonds. If I am going to continue making these, I probably need to get some dog bone cookie cutters.

101_1249

They were excited to try them a little warm!

101_1247

This morning, I tried out a scones recipe. They were very good, but there was one casualty that hit the floor before getting to the cooling rack. sigh...

101_1250

Other things that I accomplished this weekend are grafting the toe of the first sock in the purple and starting the second in the pair, piecing the backing for the last Scrap Squad and getting it loaded on the frame, quilting just about half of the Scrap Squad quilt, working on step 5 of the Easy Street mystery and working on a Midget Block.



What a great weekend!!

Monday, January 7, 2013

Design Wall Monday - 1/7 and Easy Street Link Up

I spent all weekend working on the Easy Street mystery and catching up on shows on my DVR. I feel very relaxed and ready to tackle the work week now! Of course, you may need to ask me on Tuesday if that feeling has stuck with me! ;)

I still have to cut out the green parts, but I have made great progress on steps 1 through 4. And part of 7.

101_1236

I may not be able to get back to this until after I get a couple of quilts quilted. My fingers are crossed that one of the thread orders I placed last week are delivered today! There is a guild meeting tonight that I might be skipping if the thread is delivered today so that I can get home and get to quilting.

I have really been enjoying the Easy Street mystery and I love the reveal so I am excited to keep stitching on my parts, but things will have to be put on hold as the quilting comes first.

I have done my piecing on Shirley the 301a and she is a work horse! I still don't think that I have figured out how to control her speed with the foot pedal. She is either not stitching or zippy zippy.

101_1213

I have been stitching the rows together on Moon Pie as well as my leader and ender.

101_1234

See how others are doing with their Easy Street on Bonnie's Monday Link up post.

Max even spent more time upstairs with us girls this weekend than he has done in a really long time. They were all exhausted from watching me stitch and press and stitch some more!

101_1233

Sunday, January 6, 2013

Stash Report Week 52A, 2012 and Week 1, 2013

Last week was a very productive week for my stash busting! Before the new year, I got the binding made and the border cut and attached to the last Scrap Squad quilt. Here is the binding.

101_1224

I also realized that I forgot to count any of the fabric that I had cut for step one of the Easy Street mystery. So that was added in to the 2012 total.

This is where I was when I stopped sewing on New Year's Eve.

101_1223

Fabric added this week: 0.00
Fabric added YTD: 145.40

Fabric used this week: 7.58
Fabric used YTD: 181.46

Net Fabric Used: 36.06

For the last few years, I haven't done so well on busting and I am happy to report that this is my first year ending in the black! I resisted all year end clearance sales and didn't add any fabrics in the last few weeks that were not for specific projects! Woo hoo!!

And so far in 2013, I have busted more fabric on Easy Street! I am currently sewing up Step 3.


101_1232


Fabric added this week: 0.00
Fabric added YTD: 0.00

Fabric used this week: 3.35
Fabric used YTD: 3.35

Net Fabric Used: 3.35

Friday night, Lula got under foot and I stepped on her paw. After a trip to the vet, we found out it's not broken, but she has been in pain and limping ever since so she has been getting some special treatment. While I was stitching last night, I put her in the chair and rolled her close to my stool and she slept. I think she enjoyed being so close to me while I worked.

101_1231

Monday, December 31, 2012

Design Wall Monday - 12/31

After my trip north on Saturday for Shirley, the Singer 301 (it's a really great story and I encourage you to click on the link to read about it and see all the pictures!), I really wanted to spend all day yesterday being crafty and creative! I had a bit of cleaning to do, some knitting (the sock and a ruffle scarf), piecing (borders on Scrap Squad #6 and Easy Street Step 1), quilting (one on the frame and load another), and I got the heat resistant material to re-cover my big board. I ended up jumping from project to project a lot!

I did get the big board re-covered. You may remember that shortly after receiving the big board at the 2011 quilt retreat in Shipshewana, someone (ahem, Barb!) cut through the cover. "Accidentally!" I put a patch on it and the patch has been coming off for several weeks so I decided to re-cover the board. I just removed the old cover, left the layer of batting, added another layer of batting and smoothed the heat resistant fabric over it. It didn't take too long at all, but I am afraid that Barb is not allowed near it with a rotary cutter now. :)

101_1219

I did sew quite a bit with Shirley, the 301. I sewed the strip sets for Easy Street Step 1 in about 15 minutes and that was with loading a bobbin. She sure is zippy! And I got the sets pressed and about half cut down into sub units.

101_1223

I made the binding and cut and attached the borders to the 6th Scrap Squad. I can only show the binding. I need to get this quilt loaded and quilted so I can post about it and be done with Scrap Squad... I do still need to make the backing, but there is all day tomorrow for that!

101_1224

After the Scrap Squad work, I went to the basement to do a load of laundry and work on quilting. Wouldn't you know it... After going through part of one bobbin and trying to load up more, I ran out of the bobbin thread. I have another cone on order, but I could have sworn that I had a back up cone of this color. I guess that it just wasn't used as much in April when I went to the IQF show as the other cones that I did get. Or I already went through so much of it that I used the partial and another entire cone. Oh well, the quilting is on hold until I get the new cone because the quilt is so big that I am not removing it and trying to reload it.

And this means that I will have to do nothing but piecing on New Year's Day. I will probably spend most of my time on the Easy Street mystery and piecing on Shirley!

In between cutting the strips down, I threw the Moon Pie blocks on the wall. I should be able to get this assembled this week. I need to throw up the setting triangles and the border needs to be pieced. It is a piano key border and all the parts are already cut out.

101_1220

Max is very excited about all the things that I did get done yesterday! Well, not really. He wanted off the bed. lol

101_1222