Showing posts with label sweater. Show all posts
Showing posts with label sweater. Show all posts

Friday, October 11, 2013

On the Needles - 10/11

I have been doing some knitting on my second sock and a bit of swatching this week!

Here is the progress on my second sock. I have the cuff finished and I have done two of the repeats of the pattern.

101_2255

Pattern is Hermione's Everyday Sock
Yarn is Heritage Silk Paints

I started swatching for the Dianthe cardigan that is in the Capra Collection by Knit Picks. I bought Capra in the same gray as the pattern. I think that I am going to like working with this yarn!

101_2251

I decided to swatch for the Infinity Cardigan as well. I may have jumped the gun and ordered the needles thinking that I had the right size, but they may not work as I am just a tad under the 4 inches required for the swatch and I have 4 extra stitches on the needles. This yarn is Knit Picks Palette.

101_2252

Tuesday, April 23, 2013

Infinity Cardigan

I finally got the yarn for the Infinity Cardigan!


I still need to do a swatch with the yarn to see what size needles I need and then make sure that I have the circular needles with the correct size needles and wire.

Here is the yarn that I picked. It is Grizzly Heather Palette by Knit Picks.

101_1696

And while I was taking the picture, Max decided that he needed one, too!

101_1695

I know that I am supposed to be getting back to the Midget blocks, but there is so much going on and I haven't really been sewing anything. I had to get the basement ready for the new quilting frame and now I have to work on some swap blocks that I had no business signing up for that are due this weekend. So much to do, so little time!! Hopefully, I will get back to the Midgets soon. I have not forgotten them!

Friday, March 8, 2013

On The Needles - 3/8

I finally got to the toe decreases on my second sock and I have made a little more progress since getting there. You can see in the closer view that the stitches are just starting to cut in towards the center of the foot. Woo hoo!! The yarn is Knit Picks Stroll sock yarn.

101_1395

101_1396

I have been trying to decide on the pattern and yarn for the next pair of socks. As I mentioned last week, I want to try a patterned sock this time and I want to make cables and use a chart. I picked out the pink and brown yarn to use, but then I realized that the cables won't show up as well so I think that I am going to go with the brown to the left. It is Madelinetosh in Hickory and it will be a new experience for me to use this yarn as well. I am really branching out!

101_1397

The yarn to the right is Palette by Knit Picks and it will be the yarn that I will use for the Infinity Cardigan. I remembered that I bought a kit from Knit Picks and I checked to see what the yarn was last night. I am going to use this yarn to knit a swatch to make sure of the size needles that I need for the cardigan. I am ready to start it without even trying the cabled socks!

And I have my eBook that I won. Here is a picture of the cardigan from the book. The book is a Knit Picks publication. I really love this sweater!!


I also should mention that when I was pulling out the kit, I was a little shocked to find another bag of sock yarn. I really need to get knitting!

Friday, July 27, 2012

On the Needles - 7/27

I actually had the second sleeve for my sweater done last week, but I didn't get my post up in time and thought that I should just wait to post it this week.

101_0547

101_0546

Now, I just have to get up the nerve to start seaming the sweater together....

Max thinks Lula is all right now. He even let her enjoy the sunshine with him last week.

101_0557

Sunday, July 8, 2012

Monthly Accomplishments - June 2012

I'm reporting a little earlier this month than I have been. :)  Let's see what I got done!
  1. Quilted Doodle Bugs and got the binding sewn on. I still need to hand stitch the binding down.
  2. Finished knitting my Two at a time socks. I still need to sew in the ends of the yarn.
  3. Midget blocks - #38, 39 and 40, and pulled fabric for the next 10 blocks
  4. Pulled out my sweater and worked on knitting the last sleeve - here
  5. Picked up the new addition to the family on Father's Day
  6. Quilted a wall hanging for Jen in CT
  7. Quilted a baby quilt for Suzanne
  8. Kept working away on the third Scrap Squad
  9. Reorganized my master closet
  10. Watered, watered, watered outside in the heat. UGH!!
And books read...
  1. The Devil's Puzzle by Clare O'Donohue
  2. A Merry Heart by Wanda Brunstetter
  3. Catch Me by Lisa Gardener
  4. Looking for a Miracle by Wanda Brunstetter
  5. Sonoma Rose by Jennifer Chaiverini
  6. Plain and Fancy by Wanda Brunstetter
  7. The Hope Chest by Wanda Brunstetter
  8. Until Proven Guilty by J.A. Jance
Not a bad month! And I really felt like I had a lot of down time and didn't do too much. I have quite a few things that I need to finish up so I better add it all to my To Do list!

Lula is still learning how to pose.

101_0500

Friday, June 22, 2012

On the Needles Friday - 6/22

I actually got a bit of knitting in. I'm still working on the second sleeve for my sweater. I'm at least 1/3 of the way done, I think. Maybe a little more. Woo hoo!!


Although, the faster that I work on it, the faster that I will have to seam the sweater and that sort of terrifies me!

And of course, the obligatory pup picture!

101_0463

We took a walk tonight and they are all zonked out so I had to use a picture from earlier this week. :)

Friday, June 15, 2012

On the Needles Friday - 6/15

I worked on my second sleeve for my sweater this week. This is just the book that the pattern is from - not the pattern that I am making.

101_0446

I hope that I can get the ribbing done and a couple more rows on the sleeve for next week!

See how other bloggers' knitting projects are moving along at Judy's blog.

And I finally got a dianthus bloom since planting everything. Woo hoo!! I think that slugs have taken over the other dianthus plants that I have and I am going to wage a war against them! :)

101_0442

Monday, June 11, 2012

Design Wall Monday - 6/11

I made great progress yesterday and today on what is on my design wall, but since it is for the third Scrap Squad quilt, I can't show you yet. I am really liking how this is turning out!! I'm very excited by what I have planned and I can't wait to see it all come together.

But until I can show it, you will have to settle for these pictures.

Binding on the Doodle Bugs quilt. Nothing stitched down yet.

101_0436

And the second sleeve started on the needles.

101_0435

And news from the pups...

"I'm gonna be a big brother! It's a big job so I need to eat lots of bones to keep my energy up!"

101_0432

"I'm gonna be a big sister and I'm exhausted just thinking about it all. Can you get me a cold compress?"

101_0433

Wednesday, June 6, 2012

Time to Knit?

Since I finished my socks on Sunday ... well, I still need to sew in the ends, but the knitting is complete ... I was emailing with Amy about whether I should start another pair. With forcefulness wonderful encouragement, she quickly pointed out politely reminded me that I still have a sweater that needs to be finished. Such a slave driver great friend! lol

So when I got home from my Guild meeting on Monday night (by the way, anyone need raffle tickets for the raffle quilt made with batiks and Judy L's Morning Splash pattern?? lol), I dug around in my basket o' knitting and found the sweater.

101_0426

I could have sworn that I had the other sleeve done, but I guess I stopped after the first sleeve. I found the pattern book and the yarn and needles that I need and the pattern that I wrote out when I made the first sleeve. I am all ready to cast on the second sleeve to get that finished so that I can send the pieces to my wonderful friend Amy for final assembly!! Kidding! I need to do it myself. I know. sigh

And once the second sleeve is done, I still need to do a decorative ribbing around the neckline.

But after looking at this pattern, I am ready to choose the yarn from my stash for another sweater from a different book I have.

At least I will have some time for cuddling with these wonderful companions while I knit!

101_0418

Tuesday, October 19, 2010

Socks done!

Last night, I took my car in to get an oil change and while I was waiting, I finished up the second pair of socks!

100_3180

I had some issues with the Kitchener Stitch again, but who will be looking that closely at my toes??? They are now ready to be worn! And just in time for me to start another pair in November with Judy L and her sock Knit Along!

I think that Maisy wants a pair of her own!

100_3171

Now, I just need to work on my sweater and get it done! lol

Saturday, October 2, 2010

Monthly Accomplishments - September 2010

This month was not too shabby. There was a weekend used for the shop hop after all.
  1. Cut the fabric for the Split Decision quilt using the Whimsy line
  2. Finished quilting the SIS quilt and got the binding and a label on
  3. Almost finished the Bento Box blocks.
  4. Made bindings for 6 charity quilts. Only got 1 quilt completed though.
  5. Went to a new quilt guild with Barb
  6. Went on a shop hop with Barb! Day 1 and Day 2. I also won a $25 gift certificate! Woo hoo!
  7. Wrote a tutorial on using the Curve Master foot that was acquired during the shop hop.
  8. Started working on the black and white blocks and ran into a little trouble. I have figured out how to correct it, but I haven't gotten back to the blocks yet.
  9. Finished crocheting all of the granny squares for my afghan.
  10. Finished the binding and labeled the Memories of Santa quilt.
  11. Finished knitting my sweater back and started on the sleeves.
  12. Quilted a wall hanging for a retiring co-worker.
  13. Made 2 Amish Puzzle pin cushions - one for a swap and one for the Fall Into Fall Giveaway.
  14. I also worked a little on the Bear cross stitch and I am farther along that I originally thought I was! Woo hoo!! 
  15. Drew up 4 quilts in EQ7 and submitted them to AccuQuilt for their EQ7 challenge. I'm keeping my fingers crossed that they are picked!
October has great promise due to the Shipshewana Quilt Retreat in less than 3 weeks. I am very excited!!! :)

September was also a good month for reading!
  1. Vanishing Acts by Jodi Picoult - Typical Picoult. Very good!!
  2. A Walk to Remember by Nicholas Sparks - A tear jerker and not as good as the movie was. But still a good read.
  3. The 9th Judgement by James Patterson - Very intense! This was the latest installment of the Women's Murder Club and I really enjoy reading books where the main characters/protagonists are strong women. :)
  4. The Double Comfort Safari Club by Alexander McCall Smith - The latest installment of the No. 1 Ladies' Detective Agency was like coming home to old friends. Doesn't it sometimes seem like the sequels take too long to be published? I really enjoy listening to the antics of Precious Ramotswe and Grace Makutsi!
  5. Hannah's List by Debbie Macomber - A very fast and easy read. A little predictable and a little hard to digest, but a nice read.
  6. Honeymoon with Murder by Carolyn G. Hart - I started reading this book a while ago and finally picked it back up to finish it this month. I really enjoy these cozy mysteries, but this one seemed a little slow to start for me. Once it gets going though, there is a lot of action and it's pretty quick to finish! :)
 Hours were OK, but I know that the quilting hours will go through the roof with the retreat and retreat prep! :)

Hours spent - quilting - 37; knitting - 11.5; crocheting - 6.5; cross stitching - 2.5

Maisy did pretty good this month, too. She is working hard on those unfinished bones! lol

Saturday, September 25, 2010

Getting Myself Organized

I realized this week that I have lots of things that have to be done like... NOW! Well, they are not all due now, but they are all things that I should be working on. I was thinking about everything on Tuesday night and my head was starting to spin trying to figure out what has to be done and when. Wednesday, I made myself a list with due dates and I am feeling much better about getting it all done.

I'm going to share it here so that I can keep track and start marking things off.
  • Quilt wall hanging for retiring co-worker - more when I get it done and post about it
  • Quilt quilt for Shellie - I was stressing about this because I didn't have a quilting plan in my head, but after a few emails with Shellie, I am planning on loading this quilt as soon as I get the wall hanging quilted.
  • Quilt quilt for Regina
  • Write up last Board meeting minutes for the Guild. As soon as I am finished with this, I will be done with my secretarial duties! :)
  • Sleeve help at the Yarn Shop for the sweater (see below)
  • Email local quilt shops for the December Guild meeting - we are having a traveling shop hop where all the shops come to our meeting so that the members can shop
  • Quilt for Meghan's 16th birthday
  • Quilt for Granma's 80th birthday and Christmas
  • Prep for October 21st retreat
  • Pin cushion swap due Sept 30 but that I would like to mail by Tuesday
  • Prep items for Fall Into Fall giveaway
Needless to say, I am feeling a little better about what needs to be done and when it has to be finished. I would also like to be able to get the Which Witch? wall hangings done so that I can mail those out, but they are a much lower priority than the rest of this. But I will be working on them on Sunday when I get together with the Girlzzz to sew. :)

Today, I plan on working on the wall hanging to get that done so that I can show it off. It's very pretty! :)

In just a few minutes, I will be heading out to Lambikin's, the yarn shop, for the next step(s) on the sweater. I finally got the sweater back done this week and we are redesigning the sleeves so they are not fluted. I'm hoping that I can get the front and back sewn together at the shoulders too so that I can get help on the neck finishing and learn the correct way to sew pieces together. Then, I should be able to finish the sweater on my own.

100_3108

Maxie wants a sweater of his own, I think!

100_3109

Sunday, August 1, 2010

Stash Report Week 31, 2010

This was a pretty good week! Since I drew the names for the giveaway, I have been able to start working on the gifts with the fabric. And still nothing coming in! Woo hoo!

I have spent time this weekend on knitting on my sweater back and cutting fabric. I hope to finish cutting everything that I need to today so that I can start sewing things together and getting them sent off.

I would also like to get to the arm hole shaping on the sweater! Then, I will be very close to finishing it!

Fabric added this week: 0.00
Fabric added year-to-date: 244.14

Fabric used this week: 9.95
Fabric used year-to-date: 153.79

Fabric Used: -90.35

Maxie is looking forward to more knitting time!

100_2909

Monday, July 12, 2010

Busy bee here

On Friday, I posted about my plans for the weekend. I think I was extremely successful! Even prolific, some might say! ;)

I finished the sweater front.

100_2828

And started the sweater back. I actually got all of the ribbing done and a few rows of the body Sunday night, but I didn't take another picture. Imagine the sweater front again with about an inch to an inch and a quarter knit! lol

100_2830

I got the baseball quilt mostly cut out for the computer guru neighbor. (Update on the laptop - the Guru thinks that he will just have to reformat the hard drive again and drop all the files in that he saved from last time. I think that I am going to give him my external hard drive to copy the files to. Let's hope that this won't take another week... I can't stand another weekend at the library with smelly old men next to me!) Anywho, here's the pieces for his quilt.

100_2829

Now, remember those 5 projects that I have on my staging area? That would be from this post. Well, I wasn't counting my table runner that I showed. So it was really 6 plus the one that I don't want to work on but just can't store anywhere else.

Anyway, on Sunday when I got back from the library, I decided that I was going to try to work on my Jitterbug YBR and assemble the rows. As I was going along, I realized that I had a spot on each row when I would need to cut the thread to piece the last 2 pieces together. Instead, I pulled out the Bento Box pairs that I had set aside and I started using them as leaders and enders. I've never done this before because I never thought ahead to having another quilt 'ready' to piece.

I have to admit that I loved having two things going at once. And once I realized that, I jumped to the table runner and got that pieced. I am glad that I ripped out the last seam that I had put in because I found a way to line up the pieces on each side of the sashing so it doesn't look like things are floating away. I still don't like how this turned out, but I guess if someone is to use it with garland and candles or something to take away from the center blocks, it might not be so bad. (Mom? Can you do that? lol)

100_2831

A closer picture of 2 of the blocks in the runner.

100_2832

So I was able to get the runner finished, sew on 3 sets of the leader/ender Bento Box blocks and sew 3 rows of the Jitterbug together.

Can you guess what Maisy was the happiest with? And as soon as I threw the third row on the floor, Max was all over that! lol

100_2833

Sunday, July 4, 2010

Post #999!!

Otherwise known as what I have been doing on my 3 day weekend.

Yesterday, I spent the afternoon cleaning and moving things around. I finally got the label written and stitched down on the second secret quilt. I have dubbed it Brown Sugar! On Tuesday, I will take it to work and give it to a co-worker.

100_2794

Last night, I made great progress on my sweater! I got half of the last part of the front of the sweater done and started the second half! I should be able to get the front finished with just a couple more hours of knitting!

100_2795

Today, I straightened up the stash room and was getting ready to set up my machine when I realized that I was being over run by piles on my hope chest. I ended up going through the stacks and putting things away and I found a couple more things for the 1,000th post giveaway! And since my baskets of fabrics to be cut into scraps were overflowing, I decided to get those in order. I'm very close to being done with the 5" pieces and I hope that the smaller pieces go just as fast!

100_2796

Once I get this done, I will be ready to finish up another project and then cut out one of my neighbor's quilts!

Now, I'm off to start writing up my 1,000th post for the giveaway!!! Are you just so excited?!?!

Maxie thinks that breakfast in bed is the bee's knees!

100_2780

Saturday, June 26, 2010

Second sweater class

I spent Friday night working on my sweater to try and get to a point where I needed to be in order to get direction at the class. I decided to make what I am working on the front instead of the back because there is a little more that is going on in the front with the V neck I was at the shop knitting until about 4:45 and I made some great progress!


100_2756

As soon as I walked in, a worker said, "Oh, are you here for the sale?" I said, "No, for a class.... There's a sale???"

But of course!!!

In order to clear out the summer yarn for the fall and winter yarn, a lot was on sale including anything that had cotton in it. I picked up a couple of colors that were 40% off. Woo hoo!!!

100_2753

There was also a sale on fabric, but you will have to wait until tomorrow's stash report to see that! ;)

The pups were just happy that they got the run of the house when I was gone and that I came home! They would speak, but their mouths are full!

100_2751

Monday, June 21, 2010

A couple of small things

Over the weekend, I was able to get the blocks laid out and all sewn together for my SIS quilt. I also got the borders and the binding cut and the backing all picked out. I am going to piece the backing from a floral with a black background and lots of green and a fairly ugly green that actually matches the floral. How great is that?!?

I also worked on my crocheted afghan and I finished 4 more blocks and put another round on 4 different blocks. I am on the last 3 sets of blocks - 10 total. :)

And I knit! I worked on my sweater! I am up to 57 rows and 7.5"! It's looking pretty great, I think! I have to be at 13" before I can start shaping the arm holes and I think that the piece will go fairly quickly once I get there. I hope to have it almost done for my class this Saturday.

During lunch today, I got to the heel flap on the second purple sock! I didn't realize that I was so close to getting there and it was a nice feeling to know that I was farther along than I thought!

Tonight was a Guild Board meeting and since I am secretary, I had to be there. We had a couple of attendees who aren't usually there and there was information shared that somewhat shocking, but not really once it sunk in. It looks like we have some great ideas for how to proceed in our new year and I volunteered for a couple of new positions that will start officially in October, but that I will probably start working on almost immediately. I'm excited about these new jobs!

And I have a new header just in time for the 1,00th post Giveaway. My best bud Regina put it together for me! She's also come up with a blog button for the Giveaway and I am very excited to share that! This is post 980... Twenty more posts until the Giveaway... Who's excited????

I guess that it about it on the updates. I have 4 beady, little eyeballs looking at me wanting to pee so I better heed their warning and take the bodies that they belong to outside. No puddles in the house tonight!! :)

Wednesday, June 16, 2010

Knitting projects last week

In addition to the sewing that I got done last week, I got a bit of knitting done, too!

A couple of dishcloths...

100_2726

Finished a baby cap...

100_2732

And I started my Summer Sweater class!! I was the only one in the class at Lambikin's and Donna, the teacher, was very nice! I sat and knitted for the whole class and there were a couple of ladies that came in for help and sat and knitted with us. It was very relaxing and entertaining!! After two and a half hours, I have 14 rows done!

100_2727

I'm really happy with how this is coming along so far and it has been very easy to knit. Granted it's only 14 rows, but I really like the yarn!

Maxie was a little upset that I knit without him....

100_2731

Saturday, May 22, 2010

May Friday Night Sew In Results

Lots of excitement last night! I stopped at the yarn shop and signed up for a class that will start in June to learn how to make a sweater. Then, I came home and sewed on a table runner!

The summer schedule for Lambikin's showed up this week and there is a Summer Top class that I figured I could take to get the confidence to work on my other sweaters that are in line. The Open House is this weekend where you get discounts on the class cost and the supplies cost so of course I had to go and sign up.

The book came with the class cost. It is Flirt by Sirdar and I think it is just a book that is put out with patterns specifically for the Flirt DK yarn line. The sweater on the left page is the pattern that I will make. Well, with a couple of modifications... The rose will not be added and I am not sure about the fluted sleeves. And the yarn that I picked is Cotton Bamboo by Classic Elite Yarns. I have already started my gauge and I am really liking how this is knitting!! I can't wait for class!

100_2662

Here are other sweaters in this book that I think I would like to make. I LOVE the sweater on the right!

100_2663

Once I got home and finished eating my gourmet Frosted Flakes for dinner, I got to work on the table runner that I cut out this week. Here is side 1 after the first 2 steps. I have 3 steps left and then the binding goes on.

100_2659

Here's side 2. I think it looks great! It's a quilt as you go pattern - Reversible Table Runner by The Quilt Company. I got the fabrics in Florida with help from my mom.

100_2660

Of course, with all the strips and trying to make it scrappy, it creates a bit of a mess! lol

100_2661

I think that Max is happy that I made good progress tonight!

100_2664